NS from CP-Long to Huntingdon

Pittsburgh Line


Page 1 | Page 2

December 2003
Huntingdon
NS high and wide 053 speeds toward the 4th street crossing at Huntingdon.
January 2004
Mt. Union
A westbound intermodal blasts through Kistler on a windy winter afternoon.
September 2004
Mill Creek
NS SD80MAC's 7212 and 7211 are released from local service and get a chance to stretch their 5000 hp engines on the nearly flat 60 mph main line.
November 2004
Mill Creek
Nearly brand new C40-9W 9836 is leading the 11K manifest.
May 2005
Mt. Union
NS manifest 36A heads east at the 6-arch, 660 ft long Mt Union bridge 147. This train usually has tractor loads at the head end of the train.
January 2006
Lewistown
The same, but different. Juniata-built NS 2590 leads EMD-Built UP 5057. The NS unit is a phase 1 SD70M and the UP is a phase 2a
Lewistown
Brand new 2674 leads an older cousin westbound with hoppers.
February 2006
Huntingdon
Without any heads ups, I was lucky and caught NS 3329 on a westbound intermodal.
September 2006
Huntingdon
Sperry Rail Service hi-rail truck #906 is parked at the Huntingdon Days Inn.
April 2007
Huntingdon
The Juniata splits Huntingdon and Smithfield in this view. The Huntingdon prison is in the foreground.
Mapleton
US Silica "sand plant" from almost directly above.
Ardenheim
Westbound autoracks are stopped clear of Jacobs Crossing Road behind another westbound on account of single track between CP-Hunt and CP-Gray.
June 2007
Huntingdon
Westbound empty hoppers by the JC Blair building in downtown.
Huntingdon
Altoona Local C42 by the same location with fresh 5670 in OLS paint.
August 2007
Ardenhiem
C42 is westbound with just five cars.
Mapleton
538 is eastbound with two blues.
Page 1 | Page 2


Copyright © 2002-2008 Lance Myers. All rights reserved.

Back Home
Back to Pictures